The Ultrasonic antifouling system has worked extremely well for us. We fitted
transducers on each of the sea chests and without exaggerating, we had zero
growth since the install in February, intervals between cleaning heat exchangers has been significantly extended.
Jeremy Braine
Chief Engineer
M/Y JEMS.
These images from M/Y JEMS show the transducer installation using the bespoke engineered brackets to ensure maximum transmission of the ultrasound into the curved sea chest housing.